CURRENT TRAFFIC ALERTS DUE TO CONSTRUCTION
(See map below)
Updated 12/09/19

1.  Atlas 236 – 55th Avenue W and 236th Street SW

Expect lane shifts on 56th Avenue W and 236th St SW.  Also expect lane delays on 55th Ave. W.

2.  Main Street Revitalization – 236th Street SW and 58th Avenue W

On 236th St. SW, landscaping on both sides of the roadway will result in lane shifts and flagging operation throughout the week.  Travel will be maintained on both sides of 236th St. SW.  Expect minor delays.

Preparation for concrete curb, gutter and sidewalk placement on 56th Ave. W, south of 236th St. SW.  Expect lane shifts to occur in this area and minor delays.

3.  Sound Transit

Drivers should be aware of construction vehicles making right-ins and right-outs on 220th St. SW, east of 64th Ave. W.

4.  Transit Center

During daytime hours and occasional nighttime hours, construction will take place within the transit center and on 236th St. SW in front of the Transit Center from 7:00 PM to 5:00 AM.

5.  55th Ave. W Townhomes – 55th Ave. W and 234th St. SW

Frontage Improvements for the project are currently underway; including sidewalk and curb and gutter construction.  Expect lane shifts and minor delays.

6.  Solana Townhomes- - 55th Ave. W and 240th St. SW

Utility connections are currently being built.  Expect lane shifts/closures.  Minor delays are expected.

7. Creekside PUD – 226th St. W and 70th Ave. W

The site is being graded.  Expect trucks entering and leaving the site and minor delays.

8.  66th Ave. W and 216th St. SW

On the east side of 66th Ave. W, between 218th St. SW and the Interurban Trail Lane, the contractor will be working on sidewalk restoration.  Expect lane shifts and minor delays. Signage will help pedestrians with detours around the work area.

9.  Tamblyn Townhomes -58th Ave. W and 230th St. SW

Clearing, grading and utility connections will be conducted on-site.  Expect trucks entering and exiting the site causing minor delays.

10. West Civic Center Campus - 58th Ave. W and 238th St. SW 

Contractors have begun to mobilize on site.  Utility work has also started on-site.  Expect trucks traffic to occur within the vicinity and minor traffic delays.

During Civic Campus construction, access to the Mountlake Terrace Police Station will change periodically dependent upon where work is taking place. There is significant trenching and utility related work being done in front of the Police Station which could limit access. Until further notice, if access to the police station is not available from the library/police station parking lot, please try parking on 232nd Street and access the Police Station via the sidewalk that runs next to Fire Station 19. The sidewalk will run inside the fencing and lead you to the Police Department entrance.